General Cargo Terminal (GCT), Rostock, Germany
Terminal info
Specialized terminal for project cargo and break bulk in Germany
The terminal is equipped with various cranes on 13 berths allowing flexible and sufficient cargo operations solutions. All kind of break bulks can be handled in the EP General Cargo Terminal with a strong focus on metals, project cargo and wind turbines. Transport connections are excellent: rail tracks and highways: A19 to Berlin and A20 to Hamburg / Szczecin. For storage, distribution and value added services there are three quay sheds (63,000 m²) and ca. 110,000 m² open storage, all connected by rail, road and water.
Technical information
| Total concession area (m²) | 207,452 |
| Open storage area (m²) | 105,000 |
| Covered storage area (m²) | 63,000 (3x sheds) |
| Quay length (m) | 2,530 |
| Cranes | Cranes up to 144 t WLL (tandem lifting up to 288 t WLL) |
| Maximum draft/beam | Draft 8.8 – 9.3 m / beam 35 m |
| Other equipment | forklifts (up to 32 t), reach stacker (up to 62 t / up to 110 t without moving ) |
| Products handled |
|
| Certifications | ISO 9001:2015, ISO 14001:2015 |
Industries:
Address
Euroports General Cargo Terminal GmbH
Am Hansakai 14
18147 Rostock
